SAB® Pile Head Treatment & Insulation
Supply and apply of approved quality system for pile head treatment and insulation 700 MM DIAMETER :-
1-Repair / Re profiling of all Pile Head with concrete.
2-Polymer-modified bituminous coating dressed
around the pile head and continuous or connected to
substructure waterproofing and chamber / angle fillet
considered in corners or edges of piles.
Your Dynamic Snippet will be displayed here... This message is displayed because you did not provided both a filter and a template to use.
Waterproofing Materials
Your Dynamic Snippet will be displayed here... This message is displayed because you did not provided both a filter and a template to use.