Apply Neomax Adhesive 11 (adhesive) along the concrete construction joint. Wait approximately 10-15 minutes until the adhesive appears tacky.
Remove the release paper from Neomax Swelling 101 and press firmly onto the concrete surface. Neomax Swelling 101 can be used together with nails.
Ensure that the profile is securely attached to the concrete surface. Use a butt joint for joining the waterstop and ensure that the joint is firmly attached to the concrete surface.
In environments with water and rain exposure, apply Neomax Swelling Delay immediately after installing Neomax Swelling 101. Neomax Swelling Delay will protect the expansion rate from water and rain.