Preliminary preparation: If the application will be made on polyurethane based coating materials or epoxy coating, it should be done within 24 hours from the curing of the underlying material.
For periods exceeding 24 hours, the floor should be sanded or roughened by mechanical methods.DUAYEN A-325 PU Aliphatic Topcoat Paint is packaged in two separate tin boxes.
First, the 'Basic Material' is mixed in itself, then all the hardener in the small box is poured into the base material and mixed until a homogeneous mixture is obtained without dragging air.
Mixing should be done with an electric mixer.
The mixed product has a usage time of 30- 45 minutes, which varies depending on humidity and temperature.
The application is made with a brush, roller, paint gun or airless machine. The applied surface should be protected from water until 18-24 hours. It is necessary to wait 18-24 hours between applications to be made in two layers.